D.3.4 Energy storage management and integration Energy system storages (ESS) can increase energy security by improving the self-sufficiency rate, providing uninterrupted power supply functionalities 30 de junio de 2023
D.3.5 Integration with RES/storage enabled infrastructure Report on the integration of the REACT platform and core services with the pilot’s infrastructure. 19 de septiembre de 2022
D.3.3 HiL testing of optimal control and energy dispatching strategy Report on the results from lab testing (HiL – Task 3.3) of the optimal control strategy prior to 19 de septiembre de 2022
D.3.2 Early deployment at pilot sites This deliverable describes the installation and commissioning process that was followed at each of the three demonstrations sites, 19 de septiembre de 2022
D.1.3 Pilot specific demonstration scenarios Present the full set of REACT demo scenarios (technical and business models) to be deployed in the islands. 19 de septiembre de 2022
D.1.1 Pilot technical characterisation and regulatory framework Report on the technical and energy characteristics of the pilots including the associated DR-related regulatory framework. 19 de septiembre de 2022
D8.4 – REACT Market Analysis This plan includes an analysis of the market context for the solutions identified in REACT. It consists of 12 de julio de 2022
D7.1 REACT validation methodology Methodology for results validation in each pilot site. 12 de julio de 2022
D6.4 Energy management advanced visualization Report and application detailing the different energy management dashboards developed for the REACT platform. 12 de julio de 2022