Building upon the results of previously published studies within the scope of the REACT project and leaning mainly on Deliverable 1.3 Pilot specific demonstration scenarios, 2.2 RES/storage enabled infrastructure planning and 2.3 Technoeconomic impact assessment.
This deliverable presents a technical deployment plan to be carried out throughout the three project pilot sites. REACT will be piloted on three demo islands: La Graciosa (Spain), San Pietro (Italy) and Aran Islands (Ireland).
This document sets out the deployment specification for the necessary RES infrastructure, generation systems, energy storage systems, ICT and controls interfaces to provide optimal control and management strategies and demand response (DR) programs, on each Demo Island
and respective demonstration areas, considering each pilot´s topological, functional, technical and user requirements. This task will identify the energy monitoring needs and required measuring points of each pilot to conduct optimal energy dispatching and control action, and will allow the energy data acquisition and monitoring of targeted areas of demo sites to create a solid baseline for project results validation.